汽車旅館論壇

標題: 72xhd9Hn3O [打印本頁]

作者: hjjgfdf57j2x    時間: 2015-6-23 12:59
標題: 72xhd9Hn3O
Excessive use of electricity burned cable
,http://www.8liuxing.com/home.php?mod=spacecp&ac=blog&blogid=
 
After the power failure, the maintenance of the generator have confirmed that due to excessive use of electricity,http://kubikino.ne.jp/cgi-def/admin/C-002/sekikawa/visit/main.pl?PAGE_NUM=1, underground cables generator is burned, causing power outages.
The owners say, after 2009 Check Zhujiangdijing E area, residential been using temporary electricity. With the increase in occupancy owners transformer is difficult to maintain the entire plot of electricity. Subsequently, the transformer designed for residential building north of 1-3, and 5-8 residential building south, only powered by generators.
Owner Lee said, after a power failure, the elevator outage,http://www.hacosuke.com/hacobbs/hacobbs.cgi, the family and corridor are dark,http://taroato-hokuto.sakura.ne.jp/joyful/joyful.cgi?mode=res&no=12476, only a flashlight up and down stairs. A home owner's mother needs oxygen, power outages cause oxygen machine is not available, the elderly breathing difficulties.
 
&#160,http://zazna.com/selection/index.php?item/create_form/1;
According to the owners to statistics, since June this year, a total of 15 power outages. Mr. Zhang said the owners,nike air max 95, the elevator when the power outage,http://www.vietnavi.com, the owners often trapped in the elevator.
 
 
■ lawyers say
 
After a power outage last night, unbearably hot and nearly a hundred owners, gathered downstairs to the area, requiring the property to solve the problem.
Lawyer allowed in Beijing trader said Wang Dong, "Beijing residential and new commercial housing district municipal infrastructure and public service facilities synchronous delivery Interim Measures" provides live electricity supply scheme should be included in the relevant departments urban power supply network can not use electricity and other temporary construction does not meet the requirements of the electricity.
Yesterday,nike requin tn pas cher, the residential property manager on duty said that only after the developers will be temporarily replaced by a formal municipal electric power,http://www.nj-bridge.com/ad/Review.asp?NewsID=486, residential property in order to receive electricity. Temporary electricity are unlikely to continue,air max pas cher, specific programs are being planned rectification electricity, the specific time is uncertain.
Elderly breathing difficulties caused by a power outage
Yesterday, officials said residential property only after the developer will be temporarily replaced by a formal municipal electric power, residential property in order to receive electricity,louboutin italia, the current property owner can only try to ensure that the daily electricity.
 
 
 
 
 
 
Suppliers said Wang Dong,http://tennisshop.jp/cgi-def/admin/C-002/bulletinboard/visit/main.pl, the owners found that cells still use temporary electricity, can be resolved through consultation with the developers. If negotiations fail, may be made to the relevant authorities to understand the situation, conduct reflect and complaints, or through the legal process, the developer sued.
(Reporter Yao Yao Wang, animal husbandry, green intern) 10 o'clock last night, four residential buildings Zhujiangdijing E area power outage, until today,scarpe louboutin outlet, 4:00 before the power. According to the owners to statistics, the use of temporary power, since June this year, the cumulative total of 15 power outages.




歡迎光臨 汽車旅館論壇 (https://bbs.104mm.com/) Powered by Discuz! X3.2