汽車旅館論壇

標題: 58R5hsGV3g [打印本頁]

作者: hjfdff56t    時間: 2015-7-5 05:50
標題: 58R5hsGV3g
& Nbsp; & nbsp; 2 o'clock yesterday afternoon, the reporter saw in North alba,air jordan pas cher, the road north to the south has two obvious collapse of the deepest pit depth of two meters, there are a lot of broken asphalt beneath loess. TUNG from residents provided photos, a white van yesterday morning on the front wheel stuck in the pit. In addition to these two obvious collapse, there are many hazards along the way, the road has a lot of places cracks and dents, a step on their feet, could feel the depression following the already empty, the community is not a private car less,http://l-yc.com/bbs/forum.php?mod=viewthread&tid=396095, car ran over these "traps" at any time "caught" as well.
Welcome to comment I want to comment
(Reporter Jing Yiming) "This is less than 500 meters long road yet there are nine pit!" Yesterday afternoon, who lives in the north Sweetclover residents that, after the recent heavy rains, resulting in the emergence of a main road in the community 9 pit, including yesterday morning, there have been three cars stuck in the pit.
 
& Nbsp; & nbsp; on-site road repair sector is the section of the road to repair. According to the staff,http://planning.co.cuyahoga.oh.us, then repair the road do not meet the requirements,http://www.bjgysx.com/gybbs/forum.php?mod=viewthread&tid=379958, then authorities repeatedly urge the construction unit, in the bottom layer of pavement laid in order and material, does not oppose the use of loess,http://test.netpai.cn:9011/bbs/home.php?mod=space&uid=4549&do=blog&quickforward=1&id=158883, but each lay about 30 cm should be struck once, and the laying of the upper surface must be used in accordance with specifications of the "five materials",http://my.5754.cn/home.php?mod=spacecp&ac=blog&blogid=, now the question arises road construction unit apparently not required to do. Now the road will be re-trimmed,http://www.sofmap.com/product_detail/exec/_/sku=11366872/-/gid=SA07060000, since private cars are now not clean up the roadside, so he chose to start from the sidewalk repair,http://www.ajdt-idc.jp/community.html,scarpe hogan uomo, and then the road closures,louboutin outlet, on the road to conduct a comprehensive renovation. The construction will be used to meet the requirements of the "five material" can guarantee requirements, residents can be assured. The whole project will last for one month. Text and photo
 
Nearby residents, since last year, following the road laid sewer lines, road repair completed last December. At that time when the paving,hogan outlet online, some relevant experience to remind residents of the construction workers, when the pavement to a certain thickness, it should be a real hit,http://stopthemoney.blog.shinobi.jp, paved so old thick, do not hit one, the road is certainly not strong, but the construction workers did not adopt comments. Beijing after the last storm, the road on prominent issues, there were two private cars on the road stuck in a big hole.
Hang ground appears
 
 
&#160,air max online;Microblogging Recommended | today's hot microblogging (edit: SN026)




歡迎光臨 汽車旅館論壇 (https://bbs.104mm.com/) Powered by Discuz! X3.2