汽車旅館論壇

 找回密碼
 立即註冊
搜索
熱搜: 活動 交友 discuz
查看: 365|回復: 0
打印 上一主題 下一主題

AuCA58EeXT

[複製鏈接]

33

主題

33

帖子

165

積分

註冊會員

Rank: 2

積分
165
跳轉到指定樓層
樓主
發表於 2015-6-25 11:55:05 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
Zhuhai publicly report their own developers real estate development (water holidays) Use of non-compliance pile, bear responsibility for fear of future problems, requiring demolition and reconstruction, July 26, after the disclosure of the Southern Metropolis Daily caused widespread concern. 27, Zhuhai City Housing Construction Bureau written response to developers questioned said that after testing the water after Piles holiday projects are in line with the requirements of the installation is complete. In this regard, the developer does not accept, worried that problems still want him to bear responsibility. Provincial Institute of Civil Engineering from Wang, vice chairman and secretary general said that after the implementation of new standards,Louboutin Homme,http://my.5754.cn/home.php?mod=spacecp&ac=blog&blogid=, building side is still using the old standard of Pile indeed illegal, but that does not mean that the use of the old pile of buildings can not be used, the proposed developer to reflect the provincial Housing Department for the panel to pile and housing safety were identified.
 
Zhuhai Construction Bureau: The reported building pile has passed inspection
 
July 25, beads Heise Park real estate developers and recycled nutrients (a pseudonym) to open a number of media reports, there are quality problems which developed in cooperation with the Zhuhai Water Holiday Mansion, because investors beads  and construction side in violation of state standards using the building did not meet the old pile, resulting in the presence of the seismic performance of the project a serious security risk, requiring demolition and reconstruction, in order to avoid problems with the project, which should bear legal responsibility in the future.
 
27, the building housing the Bureau of Zhuhai written response, said the new national standard on pile of (GB 13476-2009) in March 2010 implementation of the new standard pile how standard atlas production was first implemented in September that year. The Holiday Mansion water early in November 2009 has been completed according to the old standard construction design, and in February 2010 through the construction plan review, examination results qualified.
 
Zhuhai Housing Construction Bureau, Piles Holiday Mansion use of water sourced from the construction unit, with factory certification,http://forum.hnsdyd.com/forum.php?mod=viewthread&tid=779883,Louboutin à Bout Ouvert, and by the construction and supervision units site examination, after the pile foundation construction is completed,http://www.zhuzhou.com/home.php?mod=spacecp&ac=blog&blogid=,Louboutin Bottines, also were tested, the results were in line with Claim. During the construction process, the council also found under the quality inspection stations approved construction design documents chosen pile of old standards, and notify the construction unit contact on the pile engineering design unit for review, but the review comments design unit is the basis of the pile carrying capacity can meet the design requirements. January 15, 2011, building, construction, supervision,http://shop.nujiangw.com/forum.php?mod=viewthread&tid=366399&extra=, design and survey unit sub-division of the pile foundation engineering quality inspection, agreed qualified acceptance, Ze Park real estate development company of pile foundation agreed acceptance, and stamped confirmation.
 
Building housing the Bureau concluded that the reported water building pile construction program to meet the requirements.
 
Investor: Report developers not for security, had ulterior motives
 
Investors Haihong Ji Chu south are a responsible person yesterday told reporters that the reason why the media taek Park estate report, not out of security concerns, but other intentions. The responsible person, the water building built cap, investors have put in more than 40 million, and the project uses only 204 pile, not the developers said the investment only 20 million, Pile 400,http://0771r.com/home.php?mod=spacecp&ac=blog&blogid=, thus building lack of newer standard steel only 400 roots. The project began in October 2010 to play pile, pile portfolio from the new promulgation of only one month's time, when the market almost can not find Piles new standard, "the old and new standards during the transition period, the Many construction projects use the old standard pile, but our quality is no problem,http://2wooolsf.com/forum.php?mod=viewthread&tid=793057, the project has passed the acceptance,Louboutin Mary Jane, they are qualified. "
 
Developer: After problems, responsibility or I come back
 
For Zhuhai building housing the Bureau of recovery and investors explanation, developers do not accept recycled nutrients. "National earthquake lessons learned, as early as 2009 on the introduction of a new pile standard, to March 2010 was formally implemented, the middle has set aside enough time." Recycled nutrients in question, investors are abiding by the law, law enforcement lax,http://junkhead88.com/forum/viewtopic.php?pid=151311#p151311, so that national mandatory standards to become a dead letter.
 
Meng Kai said, from the current responses received, including quality inspection stations and other government authorities has not yet been determined if the quality of housing, but said "building, construction, supervision, design and survey unit agreed to qualified acceptance", equal to It is to allow the construction side to build their own homes to determine eligibility, no legal effect, "after problems, responsibility or my developers come back."
 
[Experts]
 
 
 
Pile with old standards are indeed Building Regulations Expert Group recommended to find safety appraisal
 
Guangdong Provincial Institute of Civil Engineering, vice chairman and secretary general, precast piles from senior industry expert Wang introduction, until a new pile of Standards, the state has set aside a buffer of time,http://www.tingchee.com/forum.php?mod=viewthread&tid=4351003, not suddenly promulgated in the law, the new standards After implementation, all real estate must comply, otherwise is illegal, but in practice, does have some real estate because of the new standards are not familiar with, or new standards pile expensive price than the old standard and other reasons, continue to use the old standard of pile to build your house,Louboutin Plates-forme, similar cases is not a holiday in the water project.
 
Wang said from using the old standard although illegal, but does not represent the old pile must not be used, after all, before the introduction of new standards, many projects are used in the old standard, while in the case of the project has been capped simply a The demolition is not good. Developers proposal to reflect the provincial Housing Department, the provincial Housing Department to find the expert group of five or more people pile on the project and safety were identified, and then take appropriate measures based on the identification results.
 
Southern Reporter Chen Yan Liang
 
(Original title: Developer: unsafe building to be demolished building housing the Bureau: has acceptance are qualified)
 (Edit: SN021)
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

Archiver|手機版|小黑屋| 汽車旅館網  

GMT+8, 2025-11-13 19:40 , Processed in 0.043125 second(s), 25 queries .

Powered by 104mm! BBS X3.2

© 1999-2015 104mm.com

快速回復 返回頂部 返回列表