|
|
Mingming Ma empty road will not let go, plus the time to work, many people on the scene police temporary traffic control is not satisfied. To this end,http://www.boki-navi.com, Qinhuai police special apology to the public through the media blocked. Police said that for safety reasons the transfer of detainees, police were unable to advance on the road of regulatory measures issued a notice,http://www.hg0027.cc/read.php?tid=2937439&ds=1,Louboutin Souliers Plat,http://www.jp-ia.com, please understand.
Yesterday, 9:00, well-prepared,http://www.enochnj.org/pagegen.cgi, prisoners overall repledge officially started. Police dog patrols, police, special patrol were armed guard deterrent, according to program all the war police,Louboutin Mary Jane, who set the timing, posts and responsibilities,Louboutin Pas cher, staring at each link. Since the high-speed railway construction, muck cars, construction vehicles back and forth,http://www.sustainabilitystore.com, resulting in double Yee road traffic complex. After communication with the high-speed rail construction side, high-speed rail construction stopped in yesterday morning, to protect the safety of the overall transfer charge.
Yesterday morning, the connection to the main city Jiangning Kazimen blocked viaduct viaduct and fork was packed. "This is not Monday, so plugging how!" Mike citizen driving to urban areas for work, even though 10 minutes earlier to go out, the result was stuck in traffic, appeared to be late,Louboutin Homme, he was anxious like ants on a hot pan, but there is no Method.
 ,http://55baby.com/forum.php?mod=viewthread&tid=322952;
Yesterday morning, I had very blocking Kazimen viaduct serious congestion occurs again, and let the drivers understand is that Mingming Ma empty road traffic police on duty but is stunned to let go. This is the Editor's Note It turned out that morning Qinhuai detention center moved to the new site,http://bbs.e23.cn/home.php?mod=space&uid=3356309, more than 300 detainees big shift,http://snowstorm.sourceforge.net/cgi-bin/site.cgi, because the task requires secrecy, police were unable to inform the public in advance bypass, causing road congestion.
Transfer of prisoners, motorcades.
9:50, at more than 500 police escort, nearly 300 detainees in custody in place all security, repledge action to end. After more than a year of construction, located safflower street Guang Yang Luo community field Qinhuai District Detention Center successfully completed a new site. Police advise the families of detainees met with immediate effect, the meeting place of transfer to safflower street Guang Yang Luo community field,Louboutin Baskets Femme, specifically address the twin Qi Guang Yang Road, near the roadside on the Square near the bridge, take the 316 road at Gate Station Square After walking.
9:15 or so, in the traffic police on duty of the Third Brigade commander, Shuanglong Jie opened a high-speed rail the next exit, nearly 20 Qinhuai District Detention Center loaded with nearly 300 detainees in the vehicle police escort slowly to the Yanxi Road (double Qi Road) fled. Subsequently, the traffic police before allowing two-way blocking nearly six kilometers of vehicle quick release.
|
|