|
|
Frightening bamboo footbridge.
Bamboo built pedestrian bridge, or on the highway, do you dare to go? Recently,Louboutin Bottines, an article entitled "Ray, music should be on the highway overpass,Louboutin Souliers Plat," the post appears in the Voices and other online communities. Net posts after exposure, quickly attracted attention of many users. User Reviews, this bridge can not last long, security risks too big now! & Nbsp; & nbsp; & nbsp;
■ Reporter Jiang Xiaokang
"Skywalk" Just a few bamboo structures
Net posts, said on December 7 that the forthcoming opening of the music to high-speed Yibin domestic large tower sections, see the construction of a highway in the middle of such a "skywalk": only a few bamboo bridge structures. & Nbsp; "skywalk" Ray's still above the slogan: "Farmers want to arable land,Louboutin Botte,http://chaos-file.jp/bbs2/bbs.cgi, students crossing" and so on. & Nbsp;
Net posts photos provided shows that "skywalk" arched across the highway has not been fully repaired,http://oar.marine.ie, bridges alone in the middle of four bamboo supports, bridge guardrail is made of bamboo structures, looming on the fence Several slogans.
Net posts, said, in order to build this "bridge" to give points "level" and "craft" and even exercise snack. It is said that & nbsp; "bridge" is a makeshift, repair nearby underground passage, it should be only temporary. "However, after a high-speed pass, can not walk, there are security risks." Netizen said.
"Construction side did not build this bridge"
8 pm, the reporter was removed in touch Shandong Expressway Group Co.,http://meguru.jp/cgi-bin/joyful/joyful.cgi, Ltd. in Sichuan Yibin music to Highway Office. A staff member surnamed Wang denied the existence of a bamboo footbridge, he said that music should be built in several sections of high-speed large tower footbridges, but they are reinforced concrete bridge. "Construction side did not build this bridge,http://cde.uv.es, I have not seen at the site. Repair this bridge on the highway, not kidding."
The other side also said that music should speed has not been completed, yet all closed,http://www.operabase.com/listart.cgi,Louboutin à Bout Ouvert,[url=http://maximum.room.ne.jp/bbs/yami/yybbs.cgi/http://maximum.room.ne.jp/bbs/yami/yybbs.cgi/[/url], and did not affect the normal passage of the people. Moreover, following the highway built up to 4 m span culvert channel, people did not need to take the bridge.
"When the line outside the construction is completed,http://www.kang5kang.com/forum/forum.php?mod=viewthread&tid=1317453,Louboutin Mary Jane, all the roads are smooth truncated when connected, people can smooth passage, even if there is such a bridge (bamboo footbridge) also dismantled." The staff said.
User: paying attention to the relevant departments
After exposure of the net posts, attracting many users attention. Many users worry "skywalk" security issues. There are users that this may be the construction side in order to meet the requirements of local people taken quite upset.
User "Winter is coming": This bridge can not go steady? Looking at all the rickety ah,http://www13.plala.or.jp/white_roots/gwbbs/gwbbs.cgi, winds on the back is not ah?
Friends "cherry fly": & nbsp; design this bridge really talented, but he dared to take it from the top? In case it down, took the lives of the footbridge, paying attention to the relevant departments. Do local governments have made too poor to afford the bridge?
Netizen "BLUELOVER": helpless, I am also the highway builders. This should be a temporary footbridge to do so, presumably to facilitate the removal of highway after. |
|