|
Community Service Center (circle below) will repair here
Jiangyang Department of Education: School land itself is occupied land where the village collective,air max femme, there is nothing wrong for the construction of public projects
To build on the school's playground committee office building it! During this time, the news that the Yangtze River in Luzhou City Jiangyang Huayang Street elementary school teachers puzzled and disturbed.
An excavator was opened through the playground fence bamboo fence, digging in the playground, as well as standing on the edge of the village cadres pointing,two days later, so that schools feel helpless. I just do not understand why the village committee office building to be built in the school playground?
Flood washed away half of the outer wall of the playground rental
Yangtze River Elementary School is located in the Yangtze River, the streets wind Jiangyang Huayang village,Piumini moncle, it is a have six classes, more than 160 students and 14 faculty members in a small village complete.
School covers an area of 13 acres,between May, in addition to teaching building and a teachers quarters outside the building, the original also has an area of about 3 acres of grounds,moncler soldes, including 200 m ring runway.
School officials say , 2006 flood washed away the outer portion of the playground fence,and more than 50 million demolition shall give four sons, up report after repeated unsuccessful repairs, the school had to be replaced by bamboo fence. With the destruction of the outer part of the playground surface, about half the playground can not be used.
In May this year, the higher central school Huayang school playground built in a wall, the outside of the playground will be rented to a plasterboard business use. "As a result, only half of the playground."
said that although half of the playground did not play a role, but the school is still school property.
Take excavator playground Yu Xiu Community Service Center
Recently, there have been street offices and wind village people crossed the fence, to the playground meddling.
Until last week, the fence wall was opened, the excavator began digging after entered the playground, the teachers know, the original is to build a two-story "Community Service Center" in the corner of the playground. "In fact the village is their office."
School introduction, hang village originally built office building,How to deal with an accident, repaired and then sold, and still have a place to work.
Why do they have to occupy land to build the school building it? Linde Wu said party secretary wind, ready to build the school playground is "community service center", planned repair of the first floor a total of over 300 square meters, "including the village committee's office."
School: I did not see the land use approval and other formalities
Huayang school principal Li Haiming,Handan City director, the Yangtze River land-based primary occupation of collective land. After the 2006 flood destroyed part of the wall,air max 90 pas cher, near the walled part of the school playground side idle up. May this year,Parajumpers Pas Cher, the school will be idle with a wall section in isolation,that this is a quick shortcut to making money, in order to ensure the safety of teachers and students.
Li Haiming said that the will to occupy more than 200 square meters of land in the school playground building construction, Huayang street told that the construction of public welfare community service projects, "but we do not see land use approval and other formalities. Just verbally inform our . "
Li Haiming said that currently does not affect the building for teaching in schools. When the construction of the school has asked to stay out of the channel, so as not to affect the future development of the school.
EDB: collective land no improper repair of public projects
Jiangyang Department of Education,went straight to the parking lot. After drilling business car, said the construction of the community service center on the Yangtze River Elementary School playground, after the District Government Coordination Bureau agreed. EDB believes that school
Land itself is occupied by the village collective land where, for the construction of public projects and services of local villagers there is nothing wrong.
Huayang Street office official said, in the school playground built community service center is one of the service centers along the district government unified planning. Select in the school playground,"Colleges list" is not found , because the moderate position, to facilitate the masses. "There will not affect the development of the school. If in the future need, we can give support from the land behind the school."
For strongly opposed school teacher, Huayang Street office said the main propaganda communication do not work, leading to misunderstandings teachers. At present, the street has taken a variety of forms of communication and school teachers, teachers strive to achieve understanding. Text / WCC reporter Chen Wu Jian Zhang mining |
|