汽車旅館論壇

 找回密碼
 立即註冊
搜索
熱搜: 活動 交友 discuz
查看: 512|回復: 0
打印 上一主題 下一主題

1RBSUJ00z1

[複製鏈接]

12

主題

12

帖子

70

積分

註冊會員

Rank: 2

積分
70
跳轉到指定樓層
樓主
發表於 2015-7-14 12:49:48 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
(Reporter Lu Tao) In recent days, a number of letters from the public to call the newspaper hotline to listen, reflect Hanjiadun primary school teaching building renovation project postponed again and again,http://mami-group.com/viewthread.php?tid=6653016&extra=, to this end,http://www.ciscoclub.com.cn/home.php?mod=spacecp&ac=blog&blogid=, the school has allowed close to 700 students in kindergarten transition pushed nearly 8 months.
 
It is learned that among the city schools standardization construction plan, approved by the relevant education authorities dismantled as soon as possible Hanjiadun primary street Housed in an old school building the 80s of the last century. Graduating class and first and second grade students remain in the school administration building, three to five-year moved approximately 700 students across a community nursery school building "transitional."
 
"Parents anxious, we are more anxious." Hanjiadun responsible for primary school teaching building infrastructure Wang Zhuren told reporters that the school buildings will be rebuilt at the same time expanding the school area, school buildings and land use planning and design after cumbersome approval before construction, often led to the new building could not successfully started. Only a newly expanded outside the primary school to the formalities unexpected, must first obtain a permit, and then replacement, one month after the announcement, in July this year, the school only to get land clearance.
 
Wang Zhuren said the new school building and campus design changed before and after the four draft. Since the renovation project is municipal projects, each drawing had to get the city planning department to modify the trial. Re-equipment data, queuing awaiting trial before a endure another two months.
 
School staff responsible for the infrastructure, said a mere 4,http://115.29.240.134/bbs/home.php?mod=space&uid=27142&do=blog&quickforward=1&id=3998648,000 square meters in construction,http://hg0030.cc/read.php?tid=2785895&ds=1, covering planning,http://www.wifigx.com/forum.php?mod=spacecp&ac=blog&blogid=, design, civil defense,http://www.8264.com/home.php?mod=spacecp&ac=blog&blogid=, fire protection,Louboutin Homme, garden and many approval procedures. I thought simple project bidding, the proposed standard,http://xigeart.com/forum/forum.php?mod=viewthread&tid=2960416,Louboutin Souliers Plat, but it was two months. Because organized by the District Education housing management station, a lot of things the school can not do anything.
 
Delay complete last summer,Louboutin à Bout Ouvert, between October this year nine, started seeing the foreseeable future, many parents questioning the school had vague answer, promised start time dragged on with effect from October this year, the students return to school time is unknown.
 
Due to the use of hydropower in kindergarten tenant,Louboutin Mariage, according to the property store commercial rates, plus add facilities renovation, the school is much more costly a few thousand dollars a month.
 
Yesterday, the school  said, at present,http://www.51yam.com/home.php?mod=spacecp&ac=blog&blogid=, the school has arranged for the construction team start piling up, his greatest wish is that in September next year when the school can meet the student's return in the new campus of the transition.
 
Nevertheless,Louboutin Baskets Femme, many parents still air Nanxiao hearing: "The school has repeatedly delayed expansion cycle, why should sacrifice full three semesters students at the expense of the relevant departments and schools difficult to push its responsibility?."
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

Archiver|手機版|小黑屋| 汽車旅館網  

GMT+8, 2025-7-6 02:06 , Processed in 0.066540 second(s), 23 queries .

Powered by 104mm! BBS X3.2

© 1999-2015 104mm.com

快速回復 返回頂部 返回列表